When I first created TCO, it was a way of
understanding the full life-cycle cost of assets. The basic unit of measure was
the thing, a PC, a server, and / or all the other stuff commonly found from the
desktop to the data center. My advice to Gartner clients was “when you open the
shipping boxes, out come the computers, and an assortment of people from the
help desk, system administration, security, procurement, asset management, IT
management, and end users.” The TCO was based on the physical asset and all the
related labor and service costs were bundled into that asset. This was the
logical way to look at IT in the 1980s and 1990s. TCO was designed to identify
and manage the cost of the IT asset. This was also helpful in assessing the
cost differences between vendors of those assets – famously between Wintel and
Apple assets. If you wanted to know your end user help desk costs you could
multiply the unit cost of help desk / PC and the number of PCs and it was a
reliable metric. As a management tool, It conformed to the siloed nature of IT
disciplines.
In an early wave of democratization, TCO was also a
way for IT to demonstrate the value added beyond the base cost of the PC, to
counter the end user argument that the “same” PC was cheaper at Fry’s or Crazy
Eddie’s.
Then in the late 1990’s IT organizations followed the
lead of the vendors and started restructuring their deliverables as services,
collapsing the siloes (data center, desktop, networking, applications) into
ITIL services, then packaged offerings like Infrastructure as a Service, ERP as
a Service, Business Process as a Service, Mobility as a Service, etc. Then
Service Catalogs were developed as the marketing face and cost recovery
structure for IT. While Gartner predicted ITaaS was the way to go, it has taken
IT a long time to evolve as a service provider. In the mean time the vendor
side of the market has completely reinvented itself in the service model.
Today, very few IT providers have pure play asset offerings.
Meanwhile the technology has become more abstract. Virtualization caught fire and redefined assets like servers and desktops. This has evolved to the software defined data center (SDDC) as networks and storage are virtualized.
The abstraction of physical assets was a key driver of new
ways of thinking about IT cost. Now, instead a of a one for one replacement of
a device with a cheaper, better, faster, or easier to use device, other options
emerged. These options drive multiple scenarios for an asset; It can be
replaced with another asset; it can virtualized; it can be offered as a
service; it can exist in the cloud. Financially, the asset can be capitalized,
or take one of several operating expense options. These were critical forks in
the road to determining the best TCO decisions.
Early into this phase of IT evolution, we renamed TCO
to TCS (Total Cost of Services). The TCS tool repackaged the resources into a
cost per service mold. This has been very helpful to enterprises that need to
have a cost underpinning for their service portfolios. It has also been useful
as a decision support tool to assess the cost differences between commercial
offerings. The question was no longer which server has the lowest TCO, but
which IaaS offering has the lowest TCO.
At the same time as vendors and buyers moved to a
service based model, another massive wave democratization of IT landed. IT no
longer had a captive market. The business users were shopping the market for IT
capabilities. IT has been forced to compare itself to market pricing, again to
demonstrate its competitive value and establish a base for chargeback or showback.
Without a cost basis, IT is caught in the conundrum of being perceived as both
“free” and “overpriced” depending on the situation.
Now cloud computing has emerged and virtually every
IT function is available as a service and is priced by consumption. Common
iterations of cloud include IaaS, PaaS, SaaS delivered on public, private or
hybrid platforms.
With the advent of virtualization and cloud
computing, we started talking in terms of workload. The concept of a workload
is simple – it’s a complete unit of functionality. Defining a specific workload
is trickier.
In the virtualization era, workloads were asset
defined, and while there are nuances like the fact that virtual machines need
to run on physical hosts, traditional TCO analysis could still be applied. A
virtual server is a server; a virtual desktop is pretty much a PC.
In the cloud era, services are unitized into
workloads that are created in virtual domains. The workload can be crafted to
the type of cloud offering that is a best fit. Let’s use a traditional HR
application, running on premise on physical or virtual servers. The entire
application can be viewed as a workload. Or just the infrastructure can be
isolated as a workload. Same workload, vastly different cost analysis. This workload
could also be looked at compared to a SaaS offering with similar functionality.
Again, same workload, different cost analysis.
Please note that the principles of TCO remain the
same. TCO is a holistic view of costs, across enterprise boundaries, over
time. It consists of a collection of cost items – the resources (Chart of
Accounts or Bill of Materials) and how much of those resources are consumed by
the workload.
However, workload TCO creates additional complexity
to the analysis. Multiple scenarios, using the same resources, but with
different allocations need to be projected. The tools that worked for asset
based TCO and even for TCS need to be more sophisticated, flexible and
iterative.
This is why The TCO Alliance created Workload TCO Analyst.
WTA is a powerful tool and methodology that will provide in-depth, fact-based
cost baselines and projected future scenarios. Please contact us at:
info@iiievalue.com or simply by calling me at 203.215.7717 for any questions on
how this may apply to your project needs.
HOW WORKLOAD TCO
ANALYSIS WORKS
Very recently, in an enterprise not so very far away,
a decision was made. The decision was how to best modernize an on-premises
legacy HR application.
Situation:
The 10-year old HR application was highly customized to meet the changing
business needs of the enterprise. It was integrated with several other
applications and data sources. However, it was showing signs of age. It was
increasingly down for maintenance and unplanned downtime; it was pushing the
capacity of the infrastructure; and it was not able to easily meet the new
demands of new social media and other workplace interfaces. This application is
one of many workloads requiring financial analyses to assess the cost of moving
to the cloud.
Task:
Senior management has mandated a cloud-first strategy. This requires all new
applications to be cloud-based (private, public or hybrid) and any new
investments to prefer cloud solutions. The driving forces behind this strategy
are that cloud platforms may cost less and require less capital investment,
enable a service-oriented strategy, and a more agile, responsive IT function.
As this was a >$1M project, senior management
oversight and due diligence dictated that all options be put on the table. The
most viable options were to:
A. Do nothing
B. Upgrade the on-prem application.
(Vendor support for the current version would cease in 18 mo.)
C. Modify the existing workload, make it
“cloud-ready” and re-platform it, which implied refactoring, microservice APIs
and containerization.
D. Abandon the legacy application
and move to a commercial SaaS offering
Approach:
There were many decision factors, but a primary driver was economic. Which
approach would cost less over time? This enterprise employed a process called
Workload TCO Analysis (WTA) to compare the above scenarios. WTA is based on the
concept of a Fully Burdened Workload (FBW), where TCO can be assessed for any
discrete workload.
The 8-week project process was:
1. Perform an analysis
of the current workload TCO by building a baseline resource / asset model
2. Forecast the baseline
forward with a fact-based forecasting tool
3. Develop a TCO scenario for
each option, perform an in depth financial analysis of each path forward
Result:
The engagement developed a defensible financial analysis that could be reviewed
and understood by senior management. The decision was made to take option D, sunset
the existing application and migrate to the cloud-based version from the same
vendor within the next 12 months. The organization originally compared the SaaS
costs to the on-prem costs. The WTA identified additional key costs such as
multiple APIs, business process and governance changes, and SaaS staff support
costs. The benefits of enabling new functionality and complying with the
cloud-first strategy were the business justification drivers. Management had a
clear expectation of the migration and long-term operations costs of the
application.
The project produced the additional benefits of a baseline IT cost model that will be used to:
- Build a strong financial foundation underneath your IT roadmap
- Build zero-based annual budget with what if capabilities\
- Make other point decisions as new workloads are assessed
- Build a fully loaded IT service cost consumption model
No comments: